Evoque Electrical

Solar & Battery Site Assessment β€” Newcastle NSW

Completion
0% Fill in the form to track progress
πŸ“‹

Job Details

Record the job reference, date and attending technician

Site Visit Information
Network Area (DNSP)
ℹ️Newcastle, Lake Macquarie & Maitland = Ausgrid. Rural NSW = Essential Energy.
πŸ‘€

Client Details

Contact information, ownership and property type

Contact Information
Ownership & Property
🎯

Goals & Priorities

What does the client want to achieve?

Primary Goals (tick all that apply)
Timeline & Notes
πŸ’‘

Bills & Usage

Analyse current energy use to size the system correctly

πŸ’‘Ask for last 3–4 bills or retailer app access. The NMI is on every bill β€” required for all network applications.
Account & Tariff
Usage Data
High Energy Appliances
Existing Solar
🏠

Property Details

Structure, access and site hazards

Building
⚠️Homes built before 1990 may have asbestos. Do NOT drill until checked.
Site Access
πŸ”²

Switchboard Assessment

Condition, capacity and suitability for solar/battery

⚠️Ceramic fuses must be replaced before solar. All circuits need RCD protection per AS/NZS 3000.
Main Switchboard (MSB)
Sub-boards & Meter
ℹ️A smart (bi-directional) meter is required for feed-in tariff. Client must arrange upgrade with retailer β€” can take 4–8 weeks.
⚑

Electrical Supply

Phases, mains size and service type

Phase Supply
πŸ’‘Single phase: up to 10kW export (Ausgrid). Above 5kW needs assessment. Three phase: up to 30kW.
Incoming Mains
⚠️Overhead service β€” check mast, weatherhead and cable condition. If damaged, notify DNSP first.
β˜€οΈ

Roof & Shading

Condition, orientation, pitch and shading sources

Roof Details
Orientation
🧭Use compass app. North = optimal. East/West = spread output.
Shading
☁️Shading on one panel reduces whole-string output. Use SunSurveyor app. Recommend optimisers/microinverters if unavoidable.
πŸ”†

Solar System Design

Panels, inverter and sizing

β˜€οΈNewcastle Zone 3: 6.6kW = ~26–28 kWh/day. Rule: system kW Γ— 4 = daily kWh.
Panels
Inverter
ℹ️Must comply with AS/NZS 4777.2:2020 and be on CEC & DNSP approved lists.
πŸ”‹

Battery Storage

Sizing, location and AS/NZS 5139 compliance

Battery Required?
Specification
πŸ”‹10–15kWh covers evening + overnight. LFP safer for indoor/garage.
AS/NZS 5139 Compliance
🚨NOT above sleeping area. Must be ventilated, non-combustible surface, clearances maintained.
πŸ“·

Photo Checklist

Tap each photo to mark as captured

πŸ“ΈGood lighting, no blur. Board: closed + open. Roof: all faces from ground + close-up condition.
Electrical β€” Required
πŸ“Έ
Switchboard Closed
Tap to mark captured
πŸ“Έ
Switchboard Open
All breakers/fuses
πŸ“Έ
Circuit Labels
Close-up schedule
πŸ“Έ
Meter Box
Full view
πŸ“Έ
Meter Display
Type & reading
πŸ“Έ
Service Entry
Where mains enters
πŸ“Έ
Overhead/Underground
Pole or pit/conduit
πŸ“Έ
Inverter Wall
Space & clearances
πŸ“Έ
Cable Run Path
Roof→inverter→board
Roof & Site β€” Required
πŸ“Έ
Front of Property
Street view
πŸ“Έ
North Roof Face
Main panel location
πŸ“Έ
East Roof Face
If applicable
πŸ“Έ
West Roof Face
If applicable
πŸ“Έ
Roof Material
Condition, flashings
πŸ“Έ
Roof Obstructions
Skylights, vents, A/C
πŸ“Έ
Shading Sources
Trees, buildings
πŸ“Έ
Roof Access Point
Ladder, manhole
Battery & Additional
πŸ“Έ
Battery Location
Wall, clearances
πŸ“Έ
Ceiling/Manhole
Cable access
πŸ“Έ
Asbestos Risk
Do NOT drill
πŸ“Έ
Existing Solar
If upgrading
πŸ“Έ
Hazards / Issues
Unsafe wiring, damage
πŸ“

Applications & Compliance

Every approval, certificate and registration needed

Network Applications
ApplicationWhen RequiredStatus
Ausgrid – SEG Application
ausgrid.com.au β†’ Solar & Battery
All grid-connected solar in Ausgrid area. >5kW needs assessment.
Essential Energy – Solar Connection
essentialenergy.com.au β†’ Connect
If in Essential Energy area
Export Limiting AgreementIf export exceeds feeder limit
⚠️Do NOT energise until DNSP approval. Ausgrid <5kW single phase = deemed approved after 5 business days.
CEC & Products
STCs
πŸ’°Newcastle Zone 3: 6.6kW earns ~80–90 STCs (~$3,200–$3,600). Reduces each year to 2030.
Electrical Compliance & Metering
βœ…

Summary & Quote Notes

Final assessment and actions for the office

–
Daily Usage (kWh)
–
System Size
–
Phases
–
Battery
Pre-Installation Actions
Additional Works to Quote
Notes




⚑
Evoque Electrical β€” Solar & Battery
Newcastle NSW Β· josh@evoqueelectrical.com.au